{"id":68,"date":"2024-08-29T10:15:26","date_gmt":"2024-08-29T08:15:26","guid":{"rendered":"https:\/\/energy.omnicom.md\/?page_id=68"},"modified":"2024-08-29T10:15:26","modified_gmt":"2024-08-29T08:15:26","slug":"how-to-become-our-client","status":"publish","type":"page","link":"https:\/\/energy.omnicom.md\/?page_id=68&lang=en","title":{"rendered":"How to become our client"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>\n<\/li><\/ol>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<ol class=\"wp-block-list\">\n<li>Based on information from your current account, fill out the Service Proposal Request Form.<\/li>\n<\/ol>\n\n\n\n<p>Receive our, better supply offer.<\/p>\n\n\n\n<p>If you are interested in our offer, we negotiate and sign a new, better electricity supply contract.<\/p>\n\n\n\n<p>Based on your power of attorney, we carry out the procedure for changing your electricity supplier.<\/p>\n<\/blockquote>\n\n\n\n<p><strong>Stages of the procedure of changing the electricity supplier:<\/strong><\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Conclusion of an electricity supply contract between the end consumer and the new supplier;<\/p>\n\n\n\n<p>Submission of an application for change of electricity supplier;<\/p>\n\n\n\n<p>Notification of the start of the procedure for changing the electricity supplier;<\/p>\n\n\n\n<p><br>Submission by the system operator of information on the consumption location(s) where the change of supplier is expected;<\/p>\n\n\n\n<p><br>Conclusion by the system operator and suppliers of additional agreements to contracts for the provision of electricity transmission or transmission services;<\/p>\n\n\n\n<p>Management of metering equipment and reading of metering equipment;<\/p>\n\n\n\n<p>Payment by the consumer of all billed charges prior to the date of the notice.<\/p>\n\n\n\n<p>Billing for final payment for electricity consumed in accordance with the contract with the current supplier;<\/p>\n\n\n\n<p>Payment by the final consumer of the debt owed to the current supplier.<\/p>\n\n\n\n<p>Supply of electricity by the new supplier;<\/p>\n<\/blockquote>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stages of the procedure of changing the electricity supplier: Conclusion of an electricity supply contract between the end consumer and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-68","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=\/wp\/v2\/pages\/68","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=68"}],"version-history":[{"count":0,"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=\/wp\/v2\/pages\/68\/revisions"}],"wp:attachment":[{"href":"https:\/\/energy.omnicom.md\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=68"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}